| |
|
|
British Airways
|
|
|
British Airways Component Engineering is a division of British Airways responsible for the overhaul and testing of aircraft components for internal and external customers from around the world. |
System data:
| Year of Construction: | 1999 |
| Mode of operation: | Automatic travel, manual load / unload |
| Track length: | 220 metres |
| Load type: | GKN Chep / Euro |
| Vehicle Capacity: | 1,000 kg |
| Collision Protection: | Primary: Laser Scanner, |
| Second: Perimeter Switch |
|
|
 |
 |
|
Jungheinrich Scope Of Supply
- 2 off AGV Type ERL-ID-U10
- AGV control system including RF communication
- Fire Door Interface for Control of 6 Doors
- Field Wiring for Control Stations
- Automatic Charging Function
- 10 off Purpose Built Double Shelf Trolley
|
|
|
|
|